article thumbnail

Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Additionally, interior specialties such as audio systems, wine rooms, solar systems, or home theaters, for example, should be identified and included in the schematic design budget. Extensive decks, patios, pools, and outdoor living spaces should be considered in a holistic budget during the schematic design phase.

article thumbnail

The National Speed Skating Oval or the Ice Ribbon by Populous

aasarchitecture

Ltd Client: Beijing State Asset Management Co.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

21st Century Architect Guide: 7 Visualization Tools Architects Can’t Live Without

Architizer

Schematic Design: 2D CAD Drawings – Back to the Grid Autodesk Technology Center, Boston, MA, United States Photograph provided by Autodesk With concepts refined, then comes the time to embrace the precision and orderliness of 2D CAD drawings.

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

All the logistics must be figured out before they can move on to design concepts and proposals. Schematic Design Phase: Design Proposal Once the pre-design phase is complete, the architect can move on to the design proposal.

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

All the logistics must be figured out before they can move on to design concepts and proposals. Schematic Design Phase: Design Proposal Once the pre-design phase is complete, the architect can move on to the design proposal.

article thumbnail

Romney Hall Renovation at Montana State University by Cushing Terrell

aasarchitecture

Photo © Karl Neumann Location: Bozeman, Montana, USA Architect: Cushing Terrell Principal in Charge: Jim Beal Project Manager: Bob Franzen, Melinda Talarico, Kevin Nelson Project Architect: Kevin Nelson Architectural Design/Production: Trae Schwenneker, Diego Zapata Historic Architect: Lesley Gilmore, Chelsea Holling LEED: Ashleigh Powell Programming (..)