article thumbnail

Steven Holl and SKUPINA-designed Terezín Ghetto Museum advances

Archinect

The firm was named the winner of an international competition to design an extension of the existing museum in 2022 and will deliver the project on the site, which was first constructed as a citadel in 1780. The Schematic Design phase was completed in March.

article thumbnail

Schematic Design – This isn’t “Architecture”

Life of an Architect

This phase of the work is widely referred to as “Schematic Design” Although some people also have an earlier phase called “Programming”, I tend to consider that as part of the schematic design phase as well, rather than separate it out into its own special section. It was way better.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

The process of estimating projects might be very complicated. You need funds to purchase supplies, and design drawings. That is why careful construction estimates are necessary to ensure nothing gets overlooked. To overcome these complications, you need to have the best Construction Estimating Services.

article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

LCC Health Professions Building - Schematic Design Phase rendering It’s my pleasure to currently work with Tom on the new Health Professions Building project. Robertson/Sherwood/Architects is the architect-of-record, and our frequent collaborator, Mahlum Architects , is providing design leadership.

Project 219
article thumbnail

Escalation: Predicting project costs in a volatile market

BD+C

Escalation: Predicting project costs in a volatile market 0 qpurcell Mon, 06/03/2024 - 12:26 Construction Costs Thad Berkes, Chief Cost Estimator, Design Collaborative, shares that one of the major hurdles that Design Collaborative attempts to forecast for its commercial construction projects is escalation.

Project 85
article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: The tender content is the schematic design and the foundation pit design of CGN New Research Center covering a site area of 71752.4?, CGN-202203170005) Project Location: Guangdong Province I.

article thumbnail

LCC Health Professions Building

SW Oregon Architect

From the outset of their involvement at the beginning of Phase 2, the company provided invaluable cost estimating, value engineering, constructability review, and design coordination assistance. Fortis Construction is the Construction Manager/General Contractor (CM/GC) for the project.

Building 207