article thumbnail

New York City Unveils Plans to Transform Fifth Avenue into a Pedestrian-Centered Boulevard

ArchDaily

The initiative begun with the Future of Fifth public-private partnership , which selected Arcadis , Sam Schwartz Engineering , and Field Operations to lead the design and study, and schematic design, scheduled to be completed by summer 2025. Read more »

article thumbnail

Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Additionally, interior specialties such as audio systems, wine rooms, solar systems, or home theaters, for example, should be identified and included in the schematic design budget. Extensive decks, patios, pools, and outdoor living spaces should be considered in a holistic budget during the schematic design phase.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

LCC Health Professions Building

SW Oregon Architect

Toward this end, our design emphasizes indoor air quality and thermal comfort, utilizes materials with limited life-cycle impacts, takes advantage of daylight and quality views, and optimizes energy performance. Fortis Construction is the Construction Manager/General Contractor (CM/GC) for the project.

Building 230
article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

LCC Health Professions Building - Schematic Design Phase rendering It’s my pleasure to currently work with Tom on the new Health Professions Building project. Architectural Woodwork Institute Lease Crutcher Lewis DeaMor Delta Sand & Gravel KCL Engineering Oregon Electric Group Mid-Valley Commercial Construction, Inc.

Project 237
article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: The tender content is the schematic design and the foundation pit design of CGN New Research Center covering a site area of 71752.4?, Agency: China Nuclear Power Engineering Co.,

article thumbnail

Steven Holl's 'intersecting spheres' scheme for Taipei necropolis gets green light

BD+C

The schematic design has been approved for the 50 000-sm Arrival Hall and Oceanic Pavilion for the Taiwan ChinPaoSan Necropolis. Set on an ocean-view site 40 minutes from Taipei, the arrival hall and pavilion will serve the historic complex, which has more than 10,000 existing burial sites. Body Image: read more.

article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: The tender content is the schematic design and the foundation pit design of CGN New Research Center covering a site area of 71752.4?, Agency: China Nuclear Power Engineering Co.,