Remove Document Remove Information Remove Schematic Design
article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: The tender content is the schematic design and the foundation pit design of CGN New Research Center covering a site area of 71752.4?, CGN-202203170005) Project Location: Guangdong Province I.

article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: The tender content is the schematic design and the foundation pit design of CGN New Research Center covering a site area of 71752.4?, CGN-202203170005) Project Location: Guangdong Province I.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Schematic Design – This isn’t “Architecture”

Life of an Architect

This phase of the work is widely referred to as “Schematic Design” Although some people also have an earlier phase called “Programming”, I tend to consider that as part of the schematic design phase as well, rather than separate it out into its own special section. It was way better.

article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

Level 2 – Advanced or Schematic: The estimate incorporates the developed schematic design. Level 3 – Initial or Design Development: Even during the design phase of a project, estimates are revised. Level 4: Construction or Substantive Document: After the construction designs and requirements are completed.

article thumbnail

Escalation: Predicting project costs in a volatile market

BD+C

Photo courtesy Design Collaborative Continuous Cost Analysis Throughout the life of a project, but particularly in the design process, it is imperative to continually analyze project costs. Photo courtesy Design Collaborative There is no rule of thumb that can predict how the market is going to change.

Project 85
article thumbnail

How the AIA’s New Custom Residential Agreements Help Custom Home Architects and Contractors

EntreArchitect

President, Bell Architecture APC and Leonard Kady, FAIA, Principal, Leonard Kady Architecture + Design. The first AIA Contract Documents (ACD) of their kind, ACD’s new Custom Residential Documents streamline the contractual process for architects by tailoring them for the distinctive requirements of the custom residential construction market.

article thumbnail

21st Century Architect Guide: 7 Visualization Tools Architects Can’t Live Without

Architizer

Be it through traditional (pen and paper) sketching or digital tools like SketchBook by Autodesk and Morpholio Trace , conceptualization is the wild west of design documentation, and that’s precisely what these programs are built for.