Remove Diagram Remove Estimating Remove Site
article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

The process of estimating projects might be very complicated. That is why careful construction estimates are necessary to ensure nothing gets overlooked. To overcome these complications, you need to have the best Construction Estimating Services. To provide the most accurate results, a build estimate is required.

article thumbnail

Competitions: International Competition for the development of the master plan for the "Adem Jashari" Memorial Complex in Prekaz, Municipality of Skenderaj, in the Republic of Kosovo.

Bustler

CONTACT E-MAIL: egzon.zariqi@rks-gov.net CONTRACTING AUTHORITY: MINISTRIA E KULTURES RS AND ÇJK PROJECT LOCATION: Prekaz, Municipality of Skenderaj, Republic of Kosovo TYPE OF CALL: Open Procedure ESTIMATED CONTRACT VALUE: 3,000,000.00 This Memorial Complex is the most significant site of memory in Kosovo. using the metric system.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

ICON Initiative 99 by Beta Realities

aasarchitecture

The software generates fully engineered multi-family homes, complete with area schedules, floor plans, cost estimates, and embodied carbon calculations. The software feeds fabrication information directly to 3D printers on-site for automated construction, revolutionizing on-demand housing.

Diagram 59
article thumbnail

Schematic Design – This isn’t “Architecture”

Life of an Architect

As we are talking, I would ask questions and draw diagrams right in front of the clients to make sure we were on the same page. As I was drawing, I kept saying “This isn’t architecture … this is a diagram. Your house will not look like this.” ” Although, it did look a little like architecture.

article thumbnail

Shenzhen Bay Headquarters Tower C by UNStudio

aasarchitecture

It serves as a gateway to both the site and the surroundings, and acts as a central social hub, providing visitors and the general public direct access to City Hall, the Conference Centre, and the cultural programme, as well as to the two office tower lobbies. The ‘TOD Plaza’ is on the basement level. Image © UNStudio.

Diagram 52
article thumbnail

The geometry of the Schiefferstadt House, Frederick, MD, 1758

Jane Griswold Radocchia

Perhaps the exterior plan was concept, drawn during a consultation with the owner, then staked on site, perhaps with offset lines like those we use today. Then the interior dimensions could have been used when the workmen were on site, in the future cellar. The diagram easily located the floor joists. My conclusion?

Housing 52
article thumbnail

BIM at LOD400: Why Level of Development 400 matters for design and virtual construction

BD+C

It is estimated, but it will not be known exactly until the project is complete. If engineers can maintain a higher level of influence over project outcomes and hold off on the committed project costs, it is one way to ensure the final cost and schedule better aligns with initial estimates. What are the benefits of LOD400?