Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Additionally, interior specialties such as audio systems, wine rooms, solar systems, or home theaters, for example, should be identified and included in the schematic design budget. Extensive decks, patios, pools, and outdoor living spaces should be considered in a holistic budget during the schematic design phase.

article thumbnail

LCC Health Professions Building

SW Oregon Architect

Fortis Construction is the Construction Manager/General Contractor (CM/GC) for the project. From the outset of their involvement at the beginning of Phase 2, the company provided invaluable cost estimating, value engineering, constructability review, and design coordination assistance. Rendering of the proposed multipurpose classroom.

Building 208
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

These may be done with simple hand sketches, Sketch-Up models or even Computer Assisted Design (CAD) drawings, but they will tend to be very diagrammatic and simple. Sometimes during the Schematic Design phase, several or even many alternative approaches are created for the client’s review and comment.

article thumbnail

Behind The Design 006: Get Space Vancouver by Jarod Hall of di’velept design

EntreArchitect

An hourly fee to get through schematic design so that we know what we are going to be designing and then a fixed fee after that. Describe your design team for this project. Which design software was used for this project? With contractor? What was the process for permitting? If not, what is?

Space 52
article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

All the logistics must be figured out before they can move on to design concepts and proposals. Schematic Design Phase: Design Proposal Once the pre-design phase is complete, the architect can move on to the design proposal. This phase can take considerable time, depending on building permit wait times.

article thumbnail

Better Project Management for Small Firm Architects

EntreArchitect

When we listen carefully throughout the project, our clients and contractors will guide us to success. I ask them again to state their expected budget as part of my Pre-Design Client Questionnaire to confirm their expectations in writing. We then prepare Schematic Designs based on those expectations. But I don’t say that.