Remove Contractor Remove Diagram Remove Transportation
article thumbnail

7 Top AI Tools for Generating Smart Architectural Plans

Architizer

Being a web-based accessible tool, Hypar allows architects, engineers and contractors to easily integrate their respective designs and building systems through real-time rendering and produce highly coordinated plans that are ready for construction. Finally, the software has the option of turning the zoning diagrams into furnished plans.

article thumbnail

Filter | CLB

ArchiDiaries

The structure’s concept began as a simple diagram – a folded sheet of paper, carefully sliced and able to stand on its own. The structure’s concept began as a simple diagram – a folded sheet of paper, carefully sliced and able to stand on its own. Project Description. Text as submitted by the Architects”).

Diagram 79
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Grand World Phu Quoc Welcome Center by VTN Architects

aasarchitecture

We have perfected this into a standard and the construction process here is a bit more advance in terms of transportation (we had to move bamboo into an island) and precision (several systems together require utmost precision). Diagram. The construction process of bamboo itself is unique. Photo © Hiroyuki Oki. Photo © Hiroyuki Oki.

article thumbnail

Galvaniho Business Center 5 Bratislava: GBC 5

e-architect

Technologies related to digitized standards, the physical and hygienic properties of buildings, transport handling and public transport capacity, various applications, cars, bicycles and electric scooters are permanently changing the architectural parameters of designs. Main contractor: ING Steel. Design: Šebo Lichý architects.

article thumbnail

Social housing Rembrandtweg Ridderkerk by HA-HA Design

aasarchitecture

The design utilizes a prefabricated, modular wooden system from the Rotterdam-based contractor BIK Bouw. The units will be assembled off-site, including wet walls and plumbing, and transported to Ridderkerk. The design uses two different unit types with a generous span of 7.8 Reusable Elementes.

Diagram 52
article thumbnail

Daniel Joseph Chenin, Ltd. Construct Fort 137 Featuring Unobstructed Views of the Surround Desert and Canyons

Architizer

Centered in the darkened space, a bubbling water feature recalls the sounds and smells of a desert monsoon rain transporting visitors from the fast-paced world outside and setting the scene for this modern interpretation of a fort. We also owe a lot of credit to the construction team, Forté Specialty Contractors. Team Members.

article thumbnail

Jacobs Creates Dramatic Intrigue through Spatial Overlapping and Use of Light at Kirkwood Performing Arts Center

Architizer

The parti diagrams revolved around the duality of the experience: light lobby/dark performance space, See/Be Seen, reality/fantasy, tension/release – translated as clear/opaque, heavy/light, smooth/textured… a balance of opposites. What was the greatest design challenge you faced during the project, and how did you navigate it? © Jacobs.

Art 98