Remove Contractor Remove Developer Remove Schematic Design Remove Students
article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

have in store for interested design professionals, contractors, subcontractors, and suppliers. City Of Eugene Representing the City of Eugene was Allie Camp , Development Investment Liaison for the City’s Community Development Division. billion during the past biennium.

Project 219
article thumbnail

Romney Hall Renovation at Montana State University by Cushing Terrell

aasarchitecture

The renovation of Romney Hall on the Montana State University campus modernized the historic building, originally constructed in 1922, while preserving its character and helping the university meet the needs of a growing student population. The building benefits from a high-efficiency geothermal energy system under the Romney Oval.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

Architect students typically spend between 5 and 7 years studying, and that’s even before they complete the necessary experience and further exams to obtain their licence. Architects in South Africa will need to work within the land zoning laws concerning environmental protection and commercial space development.

article thumbnail

Becoming an Architect: What You’ll Need to Know

Young Architect

Reviewing the work of contractors, so they can get paid, . A 2 hour design meeting translated into 11 months of execution and a lot of work for many people. . Architecture school teaches you to think differently, rewires your brain and most architecture students graduate being a very different person from when they started.

article thumbnail

LCC Health Professions Building

SW Oregon Architect

The second phase of design developed this concept in detail. Inside, the design further emphasizes connections and crossovers between the Dental Assistant, Dental Hygiene, Medical Assistant, and EMT programs, which are arrayed across 31,280 square feet on three floors. Rendering of the north-facing elevation.

Building 208
article thumbnail

The Ultimate List of ARE 5.0 Study Materials: Part 1

Young Architect

Project Planning and Design (PPD). Project Development and Documentation (PDD). Below is a one sentence explanation of each exam: Programming and Analysis (PA) – Understanding the problem the design will solve. Project Planning and Design (PPD) – Schematic Design Phase of the project.

article thumbnail

Letters of an Architect: Lessons from my Best Projects

Community Architect

Front of the school facing Bismarck Strasse (School website) The architectural project with all these features came to my mind when I was wondering which of the projects I have under my belt as an architect could still resonate with the students that I, at times, try to teach one thing or another. Let me explain why.

Project 80