Remove Contract Remove Diagram Remove Document
article thumbnail

Competitions: International Competition for the development of the master plan for the "Adem Jashari" Memorial Complex in Prekaz, Municipality of Skenderaj, in the Republic of Kosovo.

Bustler

CONTACT E-MAIL: egzon.zariqi@rks-gov.net CONTRACTING AUTHORITY: MINISTRIA E KULTURES RS AND ÇJK PROJECT LOCATION: Prekaz, Municipality of Skenderaj, Republic of Kosovo TYPE OF CALL: Open Procedure ESTIMATED CONTRACT VALUE: 3,000,000.00 TEAM REQUIREMENTS TO PARTICIPATE IN THE COMPETITION. using the metric system.

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

If parts of the building are to be maintained then it is especially important to get a complete documentation of the structure. The next phase is “Construction Documentation.” Since the architect created those documents there is no one who knows the design or intent better.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

The Best Architect Exam Prep Resources

The Architect's Guide

Divisions Covered Practice Management Project Management Programming & Services Project Planning & Design Project Development & Documentation Construction & Evaluation The ARE 5 Review Manual and its companion products are published by PPI. Project Development & Documentation (PDD). Project Management (PjM) ?.

article thumbnail

The Ultimate List of ARE 5.0 Study Materials: Part 1

Young Architect

Project Development and Documentation (PDD). Old AIA Contracts . Construction Evaluation (CE) – Administration of the contract during construction. . Project Development and Documentation (PDD) – Developing the design and Construction Documentation Phase of the project. The Ultimate List of 5.0

article thumbnail

Competitions: The International Competition of Open Call for the Creative Scheme of Cuihu Sports Centre

Bustler

Main design tasks (For specific requirements, please refer to the Design Specification (announcement version) , the final requirements are subject to the Competition Technical Documents ) ?1?Design Design scope and construction scale The Cuihu Sports Center project locates in the East Area of the Cuiheng New District, Zhongshan City.

article thumbnail

Competitions: Design Competition of International Islands and the Future Residence

Bustler

For detailed regulation conditions, please see competition documents – site planning and su file) Design Requirements. It is best to submit drawings according to the order of site plan – diagrams – single building – partial. Competition Documents. Two versions of materials shall be submitted. scheme title – sheet No.1/No.2/No.3/No.4"

article thumbnail

BIM at LOD400: Why Level of Development 400 matters for design and virtual construction

BD+C

This exceeds the LOD of a BIM element universally accepted by the design industry as acceptable for permit-level documents. All information sufficient to fabricate the element is contained in the modeled element. The modeled elements are not merely sufficient for bidding, procurement, or mill order. What are the benefits of LOD400?