Remove Consulting Remove Estimating Remove Structural Engineering
article thumbnail

SOM covers computing college at MIT in large glass shingles

Deezen

Other recent projects by SOM include a "vertical campus" in Cambridge for the US Department of Transportation in Cambridge and a supertall skyscraper with "monolithic simplicity" in New York City. The photography is by Dave Burk and Lucas Blair Simpson.

Glass 120
article thumbnail

AECOM and Luis Vidal place sleek red roof on Boston airport terminal

Deezen

Infrastructure consultants AECOM and Spanish architecture studio Luis Vidal + Architects have created a terminal for Boston 's Logan Airport capped by a long, bright-red roof. MEP engineering, special systems, asset management: Arora Engineers, Inc. MEP engineering, special systems, asset management: Arora Engineers, Inc.

Roofing 136
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Chuckanut Bay Rugby by Graham Baba Architects

aasarchitecture

Image © Graham Baba Architects Location: Ferndale, Washington, USA Architect: Graham Baba Architects Design team: Jim Graham, Will Wheaton, Andy Brown Structural Engineer: Kingworks Structural Engineers Civil Engineering: Freeland and Associates, Inc.

article thumbnail

Meet the Team: Who Works with an Architect on a Design Project?

DesignScape Architects

The primary role of any quantity surveyor is to manage a construction project’s costs and ensure the project is completed within the estimated budget. Their responsibilities include: Helping to estimate construction costs (e.g. Their responsibilities include: Helping to estimate construction costs (e.g.

Project 52
article thumbnail

Ross Barney Architects encloses NASA testing facility in unique copper-concrete panels

Deezen

Other buildings on the campus include a Research Support Center by TEN Arquitectos with a massive cantilevered walkway extending from its second level.

Architect 121
article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. "We hope this project will enhance urban spaces in the city, contributing to the State of Texas' and Austin's unique, vibrant identity." & Elec.

Utilities 118
article thumbnail

Deborah Berke Partners revamps modernist law centre at Harvard University

Deezen

The architects noted that much of the original building was saved — up to 80 per cent, based on their estimates. This has resulted in a "40 per cent reduction in embodied carbon emissions" when compared to the construction of a new building with standard materials, according to the studio.