Remove Concept Remove Contract Remove Diagram
article thumbnail

"Architects must reject the 'follow your passion' narrative and see ourselves as workers"

Deezen

As workers, our conception of acceptable work habits is generated from our superiors. As workers, our conception of acceptable work habits is generated from our superiors. Follow contracts exactly as they are written, and notify clients immediately when requests fall outside of the contract. We love what we do.

Contract 111
article thumbnail

Competitions: International Competition for the development of the master plan for the "Adem Jashari" Memorial Complex in Prekaz, Municipality of Skenderaj, in the Republic of Kosovo.

Bustler

CONTACT E-MAIL: egzon.zariqi@rks-gov.net CONTRACTING AUTHORITY: MINISTRIA E KULTURES RS AND ÇJK PROJECT LOCATION: Prekaz, Municipality of Skenderaj, Republic of Kosovo TYPE OF CALL: Open Procedure ESTIMATED CONTRACT VALUE: 3,000,000.00 using the metric system.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Jones Studio selected to design Central Arizona Project’s New Water Education Center

aasarchitecture

The Central Arizona Water Conservation District Board has approved a professional services contract with Phoenix-based architecture firm Jones Studio to design a Water Education Center for Central Arizona Project. The Center will be located at CAP Headquarters off 7th Street north of Deer Valley Road.

article thumbnail

Competitions: Jiaxing Ancient City Connecting South Lake International Concept Design Competition on Footbridge Crossing Huancheng River and Railway

Bustler

Evaluation Criteria According to the Competition concept and design goals, the following principles are set for the basic appraisal: 1.Principle Through diagrams and text, the scheme shall be narrated in details and be sure of its clarity and readability. It should respond to the surrounding landscape.

Concept 40
article thumbnail

The Ultimate List of ARE 5.0 Study Materials: Part 1

Young Architect

Old AIA Contracts . Construction Evaluation (CE) – Administration of the contract during construction. . Conception, Design, Documentation, Procurement, Preconstruction, Construction and Life Cycle. . Old AIA Contracts. AIA Contracts is an area you need to be careful with on the Architect Exam. .

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

Before Image of 555 Ocean Ave, Newport RI Schematic (or concept) design is the first phase where design really begins. The owner and the architect will select one of the contractors and sign a contract with them to undertake the work based on cost, schedule to complete the work, availability and skill in producing previous projects.

article thumbnail

Police Station 2050 | Future Patrol

ArchiDiaries

The concept of providing justice and inspecting wrongdoings has existed since we realized right and wrong. While in today’s world, this concept is philosophically still subjective, and in some ways different from country to country, society has a certain set of universal laws for righteousness. Key concept section x 1.