Three Pines by Resolution: 4 Architecture
Archinect
APRIL 26, 2024
Designed for a soon-to-be retiring couple, the home is sensitive to the clients wanting to age in place. On site, the local general contractor prepared the site and foundation for the arrival of six prefab modules. The vast majority of the home was fabricated off-site at a modular manufacturing facility in Pennsylvania.
Let's personalize your content