Wittman Estes creates "rapid assembly" fire station in southern California
Deezen
MARCH 5, 2024
By designing for offsite fabrication and rapid assembly, Wittman Estes streamlined the design, documentation and permitting process so construction could begin less than a year after the design process began," the firm said. Moreover, the team wanted to ensure the station could be built quickly. "By
Let's personalize your content