article thumbnail

The looming Federal Government shutdown could impinge on infrastructure projects for years

Archinect

Concerns over the possible Federal Government shutdown next month are causing headaches for contractors of much-needed infrastructure projects across the country who fear a chain reaction in the construction industry could leave lasting setbacks that would take years to overcome.

article thumbnail

Dig Studio and Lake Flato revamp Scottsdale Civic Plaza for "increasingly warming world"

Deezen

Project credits: Architectural design: Lake Flato Architects Landscape architect: Dig Studio Civil engineer: Ardurra Structural engineer: Architectural Engineers Collaborative Mechanical engineer: Affiliated Engineers, Inc.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Kevin Daly Architects and PRODUCTORA’s Houston Endowment headquarters will bring net-zero design to Texas

The Architect's Newsletter

Brought to you by: Architect Kevin Daly Architects; PRODUCTORA Location Houston, Texas Projected Completion October 2022 General Contractor W.S. Bellows Civil Engineering Brown & Gay Engineers Structural Engineering Arup Texas [.].

article thumbnail

New Messe Süd by slapa oberholz pszczulny | sop architekten | Trade fair & exhibition buildings

Architonic

architecture: slapa oberholz pszczulny | sop architekten. interior & design: slapa oberholz pszczulny | sop architekten.

article thumbnail

Cascading glass wraps mass timber office building in Kirkland by LMN Architects

The Architect's Newsletter

Architect LMN Architects Location Kirkland, Washington Occupied 2021 Structural and Civil Engineer Coughlin Porter Lundeen, Inc. Landscape Architect Hewitt Architects Lighting Design Fisher Marantz Stone MEP Engineer Rushing General Contractor [.].

Glass 117
article thumbnail

Field Architecture clads flowing Sonoma house in copper

Deezen

AIA Design Team: Ann Lowengart Interiors Project Team: Daniel Widlowski, AIA, Brian Washburn, AIA, Mark Jardine MEP Engineering: Engineering 350 Civil Engineering: Munselle Civil Engineering Structural Engineering: Strandberg Engineering Landscape Architect: Lutsko Associates General Contractor: Dowbuilt The post Field Architecture clads flowing Sonoma (..)

article thumbnail

Mae Architects completes "21st-century almshouse" in Southwark

Deezen

The photography is by Tim Crocker.

Architect 139