article thumbnail

Renzo Piano finalizes design contract for new Sarasota Performing Arts Center

Archinect

Renzo Piano Building Workshop is set to advance on its performing arts center design in Sarasota, Florida, after being named the winner of an international competition last June. The new design contract has been reported at $36.9

Contract 264
article thumbnail

Editor's Picks #564

Archinect

many good results in the built environment rely on good relationships, including well-conceived contracts…Respect is a big piece of collaboration. This is not to say that all design comes down to a contract; it is still about creative thinking. But a good contract isn’t just about business and law ".

Contract 264
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Des Moines Art Center, Mary Miss settle lawsuit over land art demolition

Archinect

A settlement has been reached in a dispute over the removal of land artist Mary Miss ’ Greenwood Pond: Double Site at the Des Moines Art Center in Iowa. The Art Center will pay the artist $900,000 for a breach of contract in its plans for its planned demolition of the 29-year-old outdoor sculpture last spring despite a court injunction.

Art 264
article thumbnail

Artist Mary Miss gains injunction against Des Moines Art Center's planned land art removal

Archinect

The lawsuit filed by artist Mary Miss in federal court in Iowa last month has gained a preliminary injunction over the alleged breach of contract stemming from the Des Moines Art Center’s planned removal of her outdoor sculpture piece Greenwood Pond: Double Site (1996).

Art 290
article thumbnail

WHY Architecture faces lawsuit over San Francisco Asian Art Museum expansion project

Archinect

WHY Architecture has been named as a defendant in a new lawsuit by the Asian Art Museum Foundation of San Francisco after allegedly failing to meet the institution’s design goals for a $38 million expansion project that was completed in March of 2020. The suit was first entered in the County Superior Court in 2021.

Art 246
article thumbnail

Artist Mary Miss files suit to stop demolition of outdoor installation at Des Moines Art Center

Archinect

Artist Mary Miss has filed a lawsuit in an ongoing dispute over the planned demolition of her outdoor installation Greenwood Pond: Double Site (1996) at the Des Moines Art Center in Iowa. Greenwood Pond-Double Site, Des Moines, IA, 1996. Greenwood Pond-Double Site, Des Moines, IA, Dec.

article thumbnail

Exploring the 2024 Collection by Ligne Roset Contract

Hotel Designs

Upholstery options include a range of contract-grade fabrics and leathers, all treated for stain resistance and easy maintenance. Kobold is available in a range of contract-grade fabrics and leathers, all treated for stain resistance and easy maintenance, with some options offering antimicrobial properties for enhanced hygiene.

Contract 105