Remove 2028 Remove Restoration Remove Sustainability
article thumbnail

GMP Architekten set to "reinvent" roof of Roger Taillibert’s Olympic Stadium in Montreal

Deezen

Read: Chatillon Architectes completes Grand Palais restoration ahead of Paris Olympics It will also be non-retractable, but only partially suspended by a cable system. The project is slated for completion in 2028. On the inside, the structure is cladded with a glass/PTFE liner which is indirectly illuminated."

Roofing 122
article thumbnail

Six Senses introduces two new gemstones into its Italian Collection

Hotel Designs

The design also showcases the brand’s deep commitment to sustainability, which flows from the materials and furnishings to the prominent space dedicated to the Earth Lab, tranquil internal courtyard, and specialty restaurant and deli featuring seasonal gastronomy. Six Senses Milan is slated to open in 2025 and Six Senses Lake Como in 2028.

IT 103
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

"The fascinating element of these Olympics are their ephemeral nature as well as their lasting impact"

Deezen

The approach of Paris 2024 has drawn a lot of attention, with many (rightly) crediting the strategy to embrace a more sustainable Olympics, one that incorporates the events into existing structures and uses temporary stands that can be re-used in the future. François Chatillon is founder of French architecture studio Chatillon Architectes.

Nature 122
article thumbnail

Capella Hotels and Resorts announces its first resort in Taiwan

Hotel Designs

This unique offering will blend traditional southern Taiwanese wellness practices with Capella’s signature lunar phase-specific therapies, providing a deeply immersive and restorative experience. Kenting’s serene atmosphere will further enrich the resort’s well-being offerings.

IT 52
article thumbnail

Powerhouse Company, Atelier Oslo, and Lundhagem win the commission to extend Rotterdam’s iconic Central Library

aasarchitecture

Construction is expected to begin late 2025 and be completed by the end of 2028, the year marking the building’s 45th anniversary. In the interests of sustainability and preserving the memory of the city, the last-century library is successfully reinvented for a new era. Image © Mir.

Cities 95
article thumbnail

Boerentoren Tower, Antwerp Belgium

e-architect

Due to open in 2028, the building will feature exhibition spaces, a panoramic viewing platform, a rooftop sculpture garden and new restaurants and bars. Whilst preserving and restoring the original features of the Boerentoren tower, Daniel Libeskind will enhance its landmark status through his distinguished architectural approach and design.

article thumbnail

Mandarin Oriental Bankside London hotel

e-architect

Design: PLP Architecture Location: Bankside Yards, Southwark, London, England, UK image courtesy of Mandarin Oriental Hotels Mandarin Oriental Bankside London hotel building Mandarin Oriental Hotel Group will open its third London hotel in the British capital in 2028.