Remove 2028 Remove Project Remove Structure
article thumbnail

OMA and WITH Architecture Studio announce Perth Concert Hall renovation plans for 2028

Archinect

The 51-year-old Brutalist structure, which was originally designed by Jeffrey Howlett and Donald Bailey, will undergo an over $98.5 Perth-based WITH Architecture Studio are included on the project team. The expectation is for renovations to be complete by the end of 2028.

article thumbnail

Jeddah Tower restarts construction after nearly seven years

Archinect

CNN is reporting on the resumed construction of Saudi Arabia’s Jeddah Tower , the Adrian Smith + Gordon Gill Architecture (AS + GG) project that will become the world’s second-tallest structure once completed in 2028.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Major League Baseball says damaged Tropicana Field won’t be playable until 2026

Archinect

million, but the report states that “the primary structure is serviceable and capable of supporting a replacement tension membrane fabric roof.” The vexing financial fiasco is further complicated as the franchise is set to expand into new digs anyway by the start of the 2028 baseball season.

Roofing 130
article thumbnail

LA issues RFQ for $352 million Exposition Park recharge

Archinect

The City of Los Angeles will issue a major $352 million upgrade to Exposition Park in its build-up to the 2028 Olympic Games in an effort to address spatial inequalities in neighborhoods that had been “historically left behind,” Governor Gavin Newsom’ s office said at the August 1st announcement.

article thumbnail

Foster + Partners' revised Television City modernization plans gets go-ahead from L.A. City Planning

Archinect

The revised version of the $1 billion project, which preserves existing William Pereira -designed heritage structures, is now less its originally proposed 15-story office tower component. Opponents had been claiming the project violated local zoning mandates. RIOS and Adamson Associates are included as part of the design team.

Cities 204
article thumbnail

Plans for world’s tallest residential tower unveiled in Dubai

Archinect

The tower is said to boast an impressive 122 floors, when it is eventually completed in 2028. billion commercial project that was announced to have broken ground in January and will be completed the same year. Image credit: Select Group They will become two of the world’s six 120+ story structures.

article thumbnail

GMP Architekten set to "reinvent" roof of Roger Taillibert’s Olympic Stadium in Montreal

Deezen

German architecture studio GMP Architekten has been selected to design a replacement for the roof of Roger Taillibert’s "controversial" Olympic stadium in Montreal for the studio's first North American project. GMP Architekten has been selected to replace the roof of the Montreal Olympic Stadium.

Roofing 122