Remove 2028 Remove Events Remove Restoration
article thumbnail

Dezeen video captures reconstructed spire at Notre-Dame

Deezen

This Dezeen video shows the restoration progress of Notre-Dame cathedral in Paris , including its reconstructed spire that is crowned by a golden rooster. However, scaffolding is expected to remain around the building until 2028.

article thumbnail

GMP Architekten set to "reinvent" roof of Roger Taillibert’s Olympic Stadium in Montreal

Deezen

In addition to a flexible integration of event technology and considerable improvements to the acoustics within, our design focuses above all on natural lighting of the stadium bowl," said GMP executive partner Stephan Schütz. "To The project is slated for completion in 2028.

Roofing 122
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

"The fascinating element of these Olympics are their ephemeral nature as well as their lasting impact"

Deezen

Unlike other games, some of these venues will never be used for sporting events again However, there is a persistent issue with Olympic developments. This will include the games this summer but also a variety of events in the future, as well as permanent public access. What happens after the spectacle of the games has finished?

Nature 122
article thumbnail

Manica designs glass-fronted stadium for Chicago Bears

Deezen

Manica Architecture designed the multi-purpose recreational campus – featuring a stadium enclosed with a translucent roof – to bring a variety of concerts, community celebrations, and sporting events to the Windy City's downtown, to replace the Bears' current home at Soldier Field.

Glass 122
article thumbnail

This week Manica Architecture unveiled glass-fronted stadium for Chicago Bears

Deezen

The stadium, which set to be located along Lake Michigan in Chicago, will function as a multi-purpose recreational campus and also host concerts and other sporting events. Manica expects to break ground on the stadium in the summer of 2025, with an opening slated for 2028.

Glass 98
article thumbnail

Mandarin Oriental Bankside London hotel

e-architect

Design: PLP Architecture Location: Bankside Yards, Southwark, London, England, UK image courtesy of Mandarin Oriental Hotels Mandarin Oriental Bankside London hotel building Mandarin Oriental Hotel Group will open its third London hotel in the British capital in 2028.