Remove 2027 Remove Construction Remove Development
article thumbnail

Chicago's 400 Lake Shore Drive developers finally set a construction start date

Archinect

In 45 days, the construction team will be on site to begin site clearing and mobilization. Once underground work is done, crews will transition to vertical construction, including concrete pours, the building enclosure, and interiors. Above-grade work will start in Q1 2025 and continue through Q2 2027.

Developer 264
article thumbnail

Zaha Hadid Architects designs superyacht marina and casino development in the Bahamas

Archinect

Details for a new luxury superyacht marina and residential community designed by Zaha Hadid Architects , the largest in North America, have been announced, along with an anticipated 2027 completion date. Working with marine biologists and local environmental bodies, any corals impacted by construct.

Developer 306
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

HKS and Hood Design Studio’s CMNTY Culture development set for a 2024 groundbreaking in Hollywood

Archinect

Urbanize LA has details on the promising development, which, when completed, will be one of the largest Black-owned enterprises in the city. Image: HKS Construction on the scheme, which is located on a four-parcel site at 6767 Sunset Boulevard, is now expected to begin in 2024 and wrap up by 2027.

Developer 345
article thumbnail

Barcelona is developing a digital twin within a 19th-century chapel

Archinect

Barcelona has become the latest city to begin construction on a digital twin of itself. Currently in a test phase, the data-driven replica of the city is expected to be operational by 2027, at which point it will be used as an urban planning tool to shape the city’s future development.

Developer 299
article thumbnail

Construction starts at SOM-designed 400 Lake Shore Drive replacement in Chicago

Archinect

The much-publicized void left behind in the wake of Santiago Calatrava ’s failed Chicago Spire proposal is finally being attended to, as now the Chicago Sun-Times and other outlets are reporting on developer Related Midwest’s start of construction for the SOM -designed replacement at 400 Lake Shore Drive.

article thumbnail

3XN GXN Unveils Design for Hybrid-Timber Office Building in Amsterdam’s Zuidas District

ArchDaily

The structure, developed in collaboration with Victory Group, Icon Real Estate, and Erik Dhont Landscape Architects, features a hybrid-timber construction system that creates a stepped volume, breaking down the building’s mass. The project is expected to begin construction in the first half of 2025 and conclude in late 2027.

article thumbnail

BIG Reveals Updated Design for Vltava Philharmonic Hall in Prague

ArchDaily

Image © BIG-Bjarke Ingels Group After winning the international competition for the design of the Vltava Philharmonic Hall in May 2022, Danish studio BIG-Bjarke Ingels Group has now developed the design into a detailed architectural study.

Permits 344