Remove 2027 Remove Civil Engineering Remove Site
article thumbnail

HOK unveils Major League Soccer's first fully electric stadium in Queens

Deezen

The stadium's groundbreaking is slated for later this year with completion planned for 2027. The screens will juxtapose the brick and black structural steel that will be included to reference the site's industrial heritage, according to HOK.

article thumbnail

13 trends, technologies, and strategies to expect in 2023

BD+C

Industrialized construction High-volume off-site construction, prefabrication, and on-site construction automation will continue to advance in response to ongoing labor and material challenges. According to Juniper Research, the number of hydrogen vehicles in service is predicted to exceed one million globally by 2027.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

WIlliams College Museum of Art by SO – IL

aasarchitecture

Image © SO – IL A courtyard garden at the heart of the museum centers nature on the site, drawing daylight into the interior. Rather than a single monolithic structure, dispersed volumes gather around this central space.

Art 59
article thumbnail

Student Performing Arts Center by Steven Holl Architects

aasarchitecture

It is a great joy and honor to work on a performing arts center for the students of this historic university on such an important site,” Steven Holl remarks. The Student Performing Arts Center is expected to begin construction in fall of 2024 with anticipated occupancy in winter 2027. The REACH Expansion at the John F.