Remove 2026 Remove Site Remove Sustainability
article thumbnail

Sagrada Família to be completed in 2026, officials say

Archinect

The completed construction of the Sagrada Família is now expected for 2026, multiple international outlets are reporting. The new completion date coincides with the centennial anniversary of the architect's death at the age of 73 from injuries he sustained in a tram accident on his way home from the site.

article thumbnail

Competitions: Barcelona World Capital of Architecture 2026 — 10 Blind Walls International Ideas Competition for Young Architects

Bustler

The proposals submitted will be evaluated according to the following objectives: urban quality , habitability , sustainability and biodiversity. The jury will select a winning proposal and a second and third prize for each of the sites, the competition has a prize fund of 52.500 euros.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Benefits of Using Sustainable Materials in Home Construction

Architecture Ideas

In 2026, the distribution of sustainable structural products worldwide is projected to remain steady, with a market share of 62.4 This figure highlights the enduring market prevalence of sustainable construction materials and the consumers’ expanding preference for eco-conscious building options.

article thumbnail

Sustainable Practice: 7 Examples of Radically Resilient and Adaptable Architecture

Architizer

Each year, the best blueprints are recognized in the Architizer A+Awards , and for 2023 a full Sustainability category was introduced. Jury Winner, 11th Annual Architizer A+Awards, Built Sustainable Landscape/Planning Project Nature thrives when everything has a role to play, a notion at the front of Yangtze Delta Polders.

article thumbnail

Henning Larsen unveils design for world's largest timber logistics centre

Deezen

Trees will provide shaded seating on the roof Expected to be completed by 2026, the Logistics Center West will be built largely from glued laminated timber (glulam) and cross-laminated timber (CLT) along with other biogenic materials. Rainwater from the rooftop will be collected and stored for sustainable reuse around the building.

Roofing 130
article thumbnail

Mass Timber Logistics Hub in Netherlands by Henning Larsen

aasarchitecture

Biogenic materials and significantly increasing biodiversity are prioritized – over 40% of the site is dedicated to its landscape, inspired by the surrounding island habitat. Driven by a shared commitment to reduce emissions, create a fair working environment and be circular by design to minimize waste and keep resources in use.

Diagram 69
article thumbnail

ZGF Architects places "nine-acre" mass-timber roof on Portland airport terminal

Deezen

The roof was assembled on-site to allow for uninterrupted operations during the construction To keep the airport operational during renovations, ZGF opted to prefabricate the massive, arching roof on a separate area on the airport property, away from the terminal. ZGF Architects has several offices across North America.

Roofing 131