Remove 2026 Remove Site Remove Structural Engineering
article thumbnail

Clayton Korte creates "familiar yet exclusive" winery buildings in California

Deezen

The team designed three buildings for the site. The structures were designed to offer a connection to the rolling terrain The third structure will hold a tasting room and is slated to open in 2026. All of the structures are designed to offer a connection to the rolling terrain striped with grape vines.

Building 116
article thumbnail

Ervin Architecture unveils expansion of Maine's largest building

Deezen

2019 saw structural and infrastructural improvements In 2018, "quasi-permanent shipping container structures" were built as annexes offsite to house food and beverage facilities, and the permanent eastside foundation was poured allowing the installation of four shipping containers that housed the corporate club spaces.

Building 111
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ZGF Architects places "nine-acre" mass-timber roof on Portland airport terminal

Deezen

The structure is technically hybrid, with the wood affixed to a series of six-foot-deep (1.8 It is part of a general renovation and expansion of the airport The last phases of the project are expected to be completed in 2026. metre) steel girders, set 20 feet (six metres) apart, that span 150 feet (45 metres).

Roofing 131
article thumbnail

Minerva House extension by Ben Adams Architects

aasarchitecture

The project will start on site in 2023 with completion expected in 2026. These thoughtfully designed terraces will preserve neighbouring amenity and contribute to local biodiversity through lush plantings. Source by Ben Adams Architects.

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

It includes two more office buildings – an eight-storey structure measuring 360,000 square feet (33,445 square metres) and a five-storey structure measuring 165,000 square feet (15,329 square metres) – as well as an extension to the Texas Capitol Mall and parking infrastructure. & Elec.

Utilities 119
article thumbnail

Sanya Horizons by Büro Ole Scheeren

aasarchitecture

Winner of an international design competition, Ole Scheeren’s vision for a tropical resort complex framing the horizon of Sanya’s spectacular coastline is scheduled to open in 2026 to enhance the experience of the natural world. The beach is the focal point of every voyage to the resort city of Sanya. Image © Büro Ole Scheeren.

article thumbnail

Fulldraw Vineyard by Clayton Korte

aasarchitecture

Photo © Likeness Studio The 12,620-square-foot winery complex consists of three buildings: a 6,972-square-foot Fermentation Building and Barrel Aging and a 2,170-square-foot Case Good Storage area, plus a second phase hospitality building that should be complete by 2026.