Remove 2026 Remove Landscape Remove Sustainability
article thumbnail

Theodore Roosevelt Presidential Library by Snøhetta rises out of North Dakota landscape

Deezen

Architecture studio Snøhetta has begun work on the Theodore Roosevelt Presidential Library , releasing the first construction images as well as renderings of the building's green roof that appears to merge with the landscape. Limited exhibitions will begin to take place late next year, with full completion slated for July 2026.

Landscape 131
article thumbnail

Henning Larsen unveils design for world's largest timber logistics centre

Deezen

Trees will provide shaded seating on the roof Expected to be completed by 2026, the Logistics Center West will be built largely from glued laminated timber (glulam) and cross-laminated timber (CLT) along with other biogenic materials. Rainwater from the rooftop will be collected and stored for sustainable reuse around the building.

Roofing 130
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Eight future stadiums set to be built around the world

Deezen

Major stadiums are currently being developed by leading architecture studios for countries including the USA, China and Italy to host everything from football and American football to baseball and the 2026 Winter Olympics. It will be built entirely from wood and powered by sustainable energy sources. It is set to complete in 2026.

article thumbnail

MENA region gaining "a louder voice" in the global design landscape, say panellists at Design Doha

Deezen

Yaquby named two Qatari architectural projects that are having an influence overseas: Msheireb, Doha's regenerated downtown quarter that employed a number of sustainable initiatives, and the World Cup stadiums, which featured inventive cooling systems so players and audiences could cope with the heat.

Landscape 114
article thumbnail

Jones Studio designs education centre to show "preciousness" of water in Arizona

Deezen

On the north side of the canal, a community gathering space placed under the solar panel-covered metal canopy will look out on a preserved desert landscape. "It In general, Farling and Swisher believe that the educational aspects of the centre can lead to the cities in central Arizona being more sustainable.

Education 137
article thumbnail

ZGF Architects places "nine-acre" mass-timber roof on Portland airport terminal

Deezen

ZGF worked with landscape architecture studio Place on the plantings ZGF Architects also said that the wood used for the engineered timber roof was sourced within a 300-mile (482 kilometres) radius of the airport, emphasising the importance of local supply chains in mass timber production. metres) – and 5,000 plants.

Roofing 131
article thumbnail

Henning Larsen wins competition for Ørestad Church

aasarchitecture

Built in wood and wood shingle, the church reflects the nature of Ørestad’s open landscape, embracing the community and its surroundings – an inverted façade design creates protrusions within the deep church walls, an extroverted space for the community. Construction is expected to start in 2024, and the church will be consecrated in 2026.