Remove 2026 Remove Engineering Remove Site
article thumbnail

Sagrada Familia announces 2026 final completion date

Deezen

La Sagrada Familia Foundation has announced that the monumental church in Barcelona is set for completion in 2026, 100 years after the death of its architect Antoni Gaudí. The Chapel of the Assumption is expected to be finished in 2025 and the tower of Jesus Christ in 2026," La Sagrada Familia Foundation told news site CNN. "The

article thumbnail

Populous unveils plan to revamp horse-racing track in New York

Deezen

Renovated spaces will include an on-site medical facility, recreation hall, track kitchen and gymnasium. After the site is cleared, structural concrete, the exterior facade, roof and canopy will be raised throughout 2025. The images are courtesy of Populous.

Events 124
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Kéré Architecture unveils design for cultural centre in Togo

Deezen

At the site dedicated to this sacred presence, the studio has added a tower with a spiral form that symbolises an upward connection and "links the divinity to the ancestors and heavens". "We We believe that to honour our traditions is to place the light of the past into the hands of the present in order to illuminate the future."

article thumbnail

Clayton Korte creates "familiar yet exclusive" winery buildings in California

Deezen

The team designed three buildings for the site. The structures were designed to offer a connection to the rolling terrain The third structure will hold a tasting room and is slated to open in 2026. All of the structures are designed to offer a connection to the rolling terrain striped with grape vines.

Building 116
article thumbnail

Henning Larsen unveils design for world's largest timber logistics centre

Deezen

Trees will provide shaded seating on the roof Expected to be completed by 2026, the Logistics Center West will be built largely from glued laminated timber (glulam) and cross-laminated timber (CLT) along with other biogenic materials.

Roofing 130
article thumbnail

Ervin Architecture unveils expansion of Maine's largest building

Deezen

By 2023, the site boasted five permanent buildings that contain four sponsored clubs, 10 corporate suites, terraced fixed seating, improved venue ingress and egress and expansive concessions options across seven acres. The photography is by Dan Finnen.

Building 111
article thumbnail

MAD to transform Chinese factory with futuristic rooftop extension

Deezen

Once complete in 2026, it is hoped to become a "multifunctional public waterfront space" catering for a mix of creative, cultural and catering businesses, MAD said. MAD's intervention focuses specifically on the Wanmicang warehouse, which occupies the south side of the site. It ceased operations in 2013.