Remove 2026 Remove Contractor Remove Estimating
article thumbnail

As the UK’s Raac problems grow, concerned educators complain of a stalled government response

Archinect

The challenge is twofold at present, with contractors' inability to hasten repairs before 2026 being made worse by Prime Minister Rishi Sunak's cuts to the rebuilding program just weeks after it was initiated. ” The country's National Audit Office estimates the cost of repairs to be £2.2 billion (or about $2.81

article thumbnail

As the UK’s Raac problems grows, concerned educators complain of a stalled government response

Archinect

The challenge is twofold at present, with contractors' inability to hasten repairs before 2026 being made worse by Prime Minister Rishi Sunak's cuts to the rebuilding program just weeks after it was initiated. ” The country's National Audit Office estimates the cost of repairs to be £2.2 billion (or about $2.81

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. Pedestrian pathways provide connections Sunset red granite and glazed curtain walls will comprise the office buildings in Phase 2, which is slated to open at the end of 2026. & Elec.

Utilities 119
article thumbnail

Renovation of Vaincre la Mucoviscidose Association Offices, Paris

e-architect

Through its new associative and strategic ViVa 2026 project, “Vaincre la Mucoviscidose”, a French association fighting against cystic fibrosis, has set the goal of strengthening bonds to build a stronger community.