Remove 2026 Remove Construction Remove Structural Engineering
article thumbnail

Tree planting ceremony marks start of construction on MVRDV’s La Serre

aasarchitecture

The first out of a total of 390 trees was planted during a ceremony that signalled the beginning of construction on MVRDV’s La Serre, a mixed-use development located in the heart of the ZAC Léon Blum eco-district in Issy-les-Moulineaux.

article thumbnail

Arch Mist wins competition to design Jamsu Bridge in Seoularch mins

aasarchitecture

In order to create designs that can be swiftly constructed and minimize maintenance, the newly added structures are designed as modular elements based on the constant span between columns. The construction begins next year and is expected to be completed by 2026.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Clayton Korte creates "familiar yet exclusive" winery buildings in California

Deezen

The structures were designed to offer a connection to the rolling terrain The third structure will hold a tasting room and is slated to open in 2026. All of the structures are designed to offer a connection to the rolling terrain striped with grape vines.

Building 110
article thumbnail

Ervin Architecture unveils expansion of Maine's largest building

Deezen

2019 saw structural and infrastructural improvements In 2018, "quasi-permanent shipping container structures" were built as annexes offsite to house food and beverage facilities, and the permanent eastside foundation was poured allowing the installation of four shipping containers that housed the corporate club spaces.

Building 106
article thumbnail

ZGF Architects places "nine-acre" mass-timber roof on Portland airport terminal

Deezen

The roof was assembled on-site to allow for uninterrupted operations during the construction To keep the airport operational during renovations, ZGF opted to prefabricate the massive, arching roof on a separate area on the airport property, away from the terminal. Resilient design strategies enable the terminal to withstand a 9.0

Roofing 131
article thumbnail

Ascent skyscraper in Milwaukee becomes world's tallest timber building

Deezen

The material also saved "three to four months of construction time", Korb said. Glulam and CLT was used for the structure. New York-based company Thornton Tomasetti provided structural engineering services on Ascent. The photography is courtesy of Korb + Associates Architects.

Building 141
article thumbnail

Fulldraw Vineyard by Clayton Korte

aasarchitecture

Photo © Likeness Studio The 12,620-square-foot winery complex consists of three buildings: a 6,972-square-foot Fermentation Building and Barrel Aging and a 2,170-square-foot Case Good Storage area, plus a second phase hospitality building that should be complete by 2026.