Remove 2025 Remove Estimating Remove Zoning
article thumbnail

Manica designs glass-fronted stadium for Chicago Bears

Deezen

A multi-story glass wall will open the north end zone to a large public plaza and a view of the Chicago skyline. It has an estimated to cost over $4.2 The plan has drawn criticism from preservationists and state officials At the moment, Manica expects to break ground in the summer of 2025, with an opening slated for 2028.

Glass 122
article thumbnail

Västerås Travel Center by BIG – Bjarke Ingels Group

aasarchitecture

The building is expected to open in 2025 and seeks to bring the entire city’s infrastructure together under one roof. On top of this landscape an environment of commercial surfaces with street furniture and protected zones gives an organic and soft expression.

Diagram 102
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Sasaki completes waterfront transformation and public park in the Port of Los Angeles

Deezen

It was designed to be an urban oasis Designed to be an oasis in the industrial context, the roughly triangular park is divided into three zones banding northward from the southern waterfront between Berths 183 and 186. "Sometimes quite obviously, but at other times, in a more playful manner." The photography is by Barrett Doherty.

article thumbnail

Austin supertalls "not really dealing with the problems" of the city

Deezen

Embedded parking levels on the lower storeys – a planning requirement – creates a class-dividing dead zone between those who live above the city and the ground-level tenants, he argued.

Cities 119
article thumbnail

Senate Bill 9: A Game Changer in California’s Housing Landscape

Santa Cruz Architect

Estimates suggest a need for 3.5 million additional housing units by 2025, far surpassing the current annual construction rate of fewer than 80,000 homes. Qualifying urban properties in single-family zones can leverage SB-9 to add a second unit, facilitating multigenerational living arrangements or rental opportunities.

article thumbnail

"We don't want to develop like Europe" says Suriname's architect minister

Deezen

Meanwhile, following the recent discovery of an estimated 2.4 It seeks to add structural plans and zoning plans to the current legislation, which dates back to 1970 and has never been updated. However, with a general election due in 2025, Dasai may not have long to deliver on his ambitions.

article thumbnail

Maryland's Key Bridge Response - A Story of Resolve, Achievement and Reverse Engineering

Community Architect

The estimate for the overall weight of the fallen bridge is 27,000 tons. The vast Cruise ship terminal is divided into zones. It is now scheduled to open in the spring of 2025. bn up from earlier estimates of $700 million including demolition of the old bridge. Work begins at 6:30am.and ends officially at 5pm.