Remove 2019 Remove Foundation Remove Site
article thumbnail

Canyon House by LOC Architects

Archinect

YEAR: 2019. The site presented a series of challenges due to the cabin being sited precariously above a dramatic topography, as well as soil instability and rigorous foundation requirements. SIZE: 1,600 SF. A young couple acquired a small cabin perched in the trees of Mt. Washington, above Los Angeles.

Architect 208
article thumbnail

Deconstruction of building made of alternative concrete resulted in just two buckets of waste

Archinect

A 700-square-foot showroom and model home displaying Nexii’s building technology was constructed in 2019 near Vancouver to prove the buildability of the new material, which has far lower emissions than conventional concrete. The building will be reassembled next.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Antepavilion competition returns for 2024 in new location

Deezen

This year's winning Antepavilion structure will be built on a plot in Southwark, rather than at its original warehouse site in Hoxton Docks where previous years' structures were installed. It was postponed indefinitely in 2022 due to ongoing disputes with Hackney Council that began in 2019. The photography is by Jim Stephenson.

article thumbnail

There’s a New Vision for Frank Lloyd Wright’s Taliesin West

Dwell

The Frank Lloyd Wright Foundation is partnering with design firm Sasaki to audit the national historic landmark’s sustainability practices. The Frank Lloyd Wright Foundation, which is headquartered here, has hired design firm Sasaki to create a holistic vision for the future of the grounds.

article thumbnail

Frank Lloyd Wright Wisconsin theatre reopens after five-year restoration

Deezen

Top photo is by Kyle Dockery courtesy of the Frank Lloyd Wright Foundation Lying within Taliesin's Hillside Home School building, which lies on the southern tip of the property, the Hillside Theatre was used both by the school and the public. Carpenter Foundation, as well as private donors. Above photo is by Tim Long.

article thumbnail

Ervin Architecture unveils expansion of Maine's largest building

Deezen

2019 saw structural and infrastructural improvements In 2018, "quasi-permanent shipping container structures" were built as annexes offsite to house food and beverage facilities, and the permanent eastside foundation was poured allowing the installation of four shipping containers that housed the corporate club spaces.

Building 111
article thumbnail

Bofill Foundation Headquarters, Barcelona, Spain

e-architect

The firm is firmly committed to integrating sustainability, technological innovation, off-site construction, and local craftsmanship in its projects, aiming for the highest certifications. Built in 1850, the 21x21m block stands as a testament to the industrial architecture of its time, representing a protected heritage example.