Gulliver DOX Centre for Contemporary Art, Prague
e-architect
JANUARY 19, 2022
The load-bearing wooden structure of the zeppelin is suspended by, and anchored to, a tilted steel-truss bridge, which also simultaneously serves as a load-bearing foundation for the interior wooden flooring of the zeppelin. Completion date: 2016. Awards: Public Interior of the Year / award 2016. Architect and author: HAMR Hu?
Let's personalize your content